December 13, 2010
East Asia Minerals Commences Independent NI43-101 Resource Estimate at Miwah

 For Immediate Release, December 13, 2010 TSXV: EAS

VANCOUVER, B.C. -- Monday, December 13, 2010 -- East Asia Minerals Corporation (TSXV-EAS) announces that Mining Associates Pty Ltd has been contracted to complete a NI43-101 compliant resource estimate and report for the Miwah Gold Project in Aceh Province, Northern Sumatra, Indonesia. The report is planned for completion end-Q1 2011 to early Q2-2011. The Company also announces that a fourth diamond drill rig is being mobilized to the property to accelerate the ongoing resource estimate drill program.

Planning for the 2011 program at Miwah has been completed. In addition to delivery of the initial resource estimate the Company anticipates completion of metallurgical, environmental and scoping studies by year end. Concurrent to the advanced program at the Miwah Main Zone, exploration including diamond drilling will continue and is designed to extend the known resource target area, and to undertake more regional work on the 30,000 hectare Miwah tenement to generate a pipeline of district-wide targets for drill testing.

"We have been consistently encouraged by the veracity of the geological model and mineralization at Miwah", stated Michael Hawkins, President and CEO of EAS. "With more than 50 successful diamond drill holes completed we are pleased to take the Miwah Main Zone to the next stage of advancement. It is our intention to deliver an initial resource estimate in the New Year and to work towards demonstrating the potential to add to these numbers. With a strong treasury, we are fully financed to complete the planned 2011 program at Miwah".

Miwah Background
The Miwah Gold Prospect was partially defined by approximately 3,100 metres of drilling in twelve holes by a previous explorer in 1997. All holes drilled during this program intersected significant alteration and mineralization with intercepts including 71 metres of 1.4 g/t gold and 58 metres of 1.1 g/t gold. The previous explorer suggested potential for 100 Mt at 1.1 to 1.2 g/t gold; however a review of the historical data indicates that early drilling was parallel to higher grade (greater than 5 g/t gold) structures at surface. Hence, in addition to greater mineralized tonnage, significantly higher overall grades are anticipated from better geological understanding, results of the Company's detailed sampling, and from the ongoing drill program which is based on increased geological understanding. An example is the intersection of 3.96 g/t gold over 111 metres, including 15.74 g/t gold over 22 metres from East Asia's diamond drill hole EMD024.

Based on the Company's work Miwah is resolving into two components; a large 1,200 metre long, at least 450 metre wide, approximately 200 metre thick tabular zone; and vertical diatreme breccia feeder zones that are beneath and cut through this. At Miwah Gold Zones, East Asia has almost 2,500 metres of rock sawn channel samples which average 2.35 g/t gold. Grade expectations in Main Miwah Gold Zone exceed 1.5 g/t gold. Ongoing sampling verified the Company's confidence that higher overall gold grades can be achieved due to the presence of multiple high grade rock sawn channel samples throughout the strike, including 4.11 g/t gold over 200 metres at the eastern part of the Main Miwah Gold Zone, and 4.35 g/t gold over 27 metres at the western part. Recent drilling has supported this. In addition to the tabular zone the Company has begun to characterize some of the diatreme breccia feeder zones, with rock sawn channel samples including 83.59 g/t gold over 24 metres and 20.14 g/t gold over 12 metres. Recent drilling has supported this. These feeder zones have great potential to develop into substantial tonnages of higher grade gold mineralization in an area adjacent to the Main Miwah Gold Zone.

The Miwah Property is in a very similar volcanic setting to the Martabe gold-silver deposit, also located in North Sumatra (Purnama and Baskara resources: 127.8 million tonnes at 1.4 g/t gold (5.5 million ounces gold) and 15 g/t silver (60 million ounces silver), and the alteration system is of a comparable size. Miwah also exhibits a likeness to the size, style and geometry of the alteration system developed at the Pierina gold deposit in Peru (67.7 Mt grading 2.98 g/t gold and 22 g/t silver, giving a total 6.49 million ounces gold and 47.9 million ounces silver).

Samples reported were assayed at Intertek assay laboratories in Jakarta. Lionel Martin, P.Geo., the designated QP within the meaning of NI 43-101, has reviewed and approves the content of this release. East Asia has not verified the classification of the resource references and is not treating them as NI 43-101 defined resources verified by a QP. Although the references of resources are relevant to recognizing the potential of the Miwah project, they should not be relied upon.

About East Asia Minerals Corporation
East Asia Minerals (EAS-TSXV) is an Asian-based, Canadian mineral exploration company with gold and copper exploration properties in Indonesia, and uranium exploration properties in Mongolia. In Indonesia the Company has a 70 to 85% interest in six advanced gold and gold-copper properties located in Aceh Province, Sumatra, and Sangihe Island, North Sulawesi. Two of these, the Sangihe (Binebase-Bawone) and Barisan 1 (Abong) gold projects, are being advanced to define NI43-101 compliant resources. The Company owns eight uranium properties, including the advanced Ingiin-Nars, Ulaan Nuur and Enger uranium projects, and two phosphate properties in Mongolia. East Asia currently has 76,040,872 shares outstanding. Its shares are listed for trading on the TSX Venture Exchange under the symbol "EAS".

Forward Looking Statements - This News Release contains forward looking information within the meaning of the British Columbia Securities Act, the Ontario Securities Act and the Alberta Securities Act, which involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation, risks and uncertainties relating to the interpretation of drill results and the estimation of mineral resources and reserves, the geology, grade and continuity of mineral deposits, the possibility that future exploration, development or mining results will not be consistent with our expectations, metal recoveries, accidents, equipment breakdowns, title matters and surface access, labour disputes or other unanticipated difficulties with or interruptions in production, the potential for delays in exploration or development activities or the completion of new or updated feasibility studies, the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses, commodity price fluctuations (including uranium, fuel, steel and construction items), currency fluctuations, failure to obtain adequate financing on a timely basis and other risks and uncertainties. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Accordingly, readers are advised not to place undue reliance on forward-looking statements. The words anticipate, believe, estimate and expect and similar expressions, as they relate to us or our management, are intended to identify forward looking statements relating to the business and affairs of the Company. Except as required under applicable securities legislation, we undertake no obligation to publicly update or revise forward-looking statements, whether as a result of new information, future events or otherwise.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To receive or stop receiving EAS news via email, please email [email protected] and state your preference in the subject line.

FOR FURTHER INFORMATION, visit the Company's website at www.EAminerals.com, or contact:

Michael Hawkins, President and CEO Vancouver T: +1-604-684-2183 E: [email protected]
Nick Kohlmann, Corporate Communications Toronto T: +1-416-792-8734 E: [email protected]
 
 

You can view the Next News Releases item: Thu Dec 16, 2010, East Asia Minerals Appoints Alex Granger as VP Business Development

You can view the Previous News Releases item: Thu Dec 2, 2010, East Asia Minerals Finds More Gold at Sipopok; Scout Drilling Planned to Commence Mid-December

You can return to the main News Releases page, or press the Back button on your browser.